Meeting Minutes 4/4/2008 MCC Mini Baja Team

Attendees: Dave Mandich, Steven Meyer, Bob Ronnenberg, Eric Robinson, Bob Day, Andy VonRathonyi, Professor Wadach, Prof Fetzner, Professor Dave Leach, Tom Farley, Jeff Scipione

 

1.      Manufacturing Report: Saturday 4-5-08 WORKDAY 9:00 AM till done.

  • Frame Schedule: Weeks to go= NINE
    • Brian Beswich has a bending tool and will bring for 4-5-08
  • Cut tubes finished count discussed
  • Assembly owners agreement:

 Engine : Justin Wilson

 Transmission : Ronnenberg

 Drive Train : Ronnenberg

 Steering: Tyler Smith and Mike Sortore

 Suspension : Ben Edwards

 Frame: Eric Robinson, Brian Beswick

 Body: Andy VonRath

 Brakes Bob Hand ?

 Safety Equipment : Andy VonRath

 Electrical : Steve Meyer

 Fasteners : Shawn Bennett

2.      BOM Cost Report Due 4/14/08 progress: Roll out to each assembly leader, designer, builder Retail costs to build one more now. Labor is $35 per hour, machining $70 per hour. We need to build in accuracy.

      3.      Design Report Progress Due 4/21/08: Waiting Ben Edwards updates. Dave Leach and I will finalize by 4/21/08.

    4.      Marketing Fund Raising Report Add: Steve Meyer Donation 250 from his families employer

·        Coyote Kart Mfg Products to 7 Turner RD Spencerport 352-0806

·        Add all Motor Cycle Shops and custom builders in 

·        Add all Lawn and Garden motor repair shops

·        Add all auto body shops to list for free advertising with spray painted frame.

·        Get internal customer base from Shirley Provost for MCC vendors.

 

5.      Trailer Sidewalls added parts for Hold downs Dave Leach

     6.      Our Budget is SA account $956 to finish the car.

a.       Plus our 250 sponsor's inputs and 8750 account balance was 360 approx.$600.

b.      IDENTIFY all items to purchase ASAP, tools, SAFETY, MATERIALS, ETC.

     7.      Finish frame color coated options so far.

  •  Metal aid in AVON Powder Coat gloss Black approx $250
  • Spray paint on Commerce Drive any color $150

     8.      Campus Community Service Day May 3 see Poster for Cobbs Hill Clean up and picnic with games.

     9.      Spring Fling Club awareness table inside the free food tent May 7 we need Club participant to sign up next years club members. We will bring over the old car.

Discuss